Project Gallery
Your development project ideas will be realized by choosing Bolson's experienced industry experts
Design Execution
Be confident in your project's completion with Bolson Engineering at your side
See your projects realized through the lens of Bolson's successfully completed developments.
Campground Expansion
Designed more than 100 additional RV camping lots at Half Moon Lake Resort, Alberta. Another phased expansion with an additional 112 campsites for Half Moon Lake Resort is underway for 2024.
Commercial Drainage Assessment
Completed a drainage assessment for an Edmonton church saving them 49% of their drainage fees.
Multi-purpose development
Managed the development of a Shell Gas and Tim Horton's combo located in Bonnyville, Alberta.
Stormwater Management Plan
Developed a drainage plan for Sunset Point, Val Quentin and Alberta Beach Summer Villages, Alberta.
Commercial Grading
Grading and servicing for a new Tim Horton's and CO-OP Gas development in Spruce Grove, Alberta.
DRAINAGE STUDY
A curated drainage study of 1 in 100 year storm event with a focus on water flow direction, drainage channels, hazard classification and flow rates in Val Quentin, Alberta.
Simplified solutions
Your simplified engineering projects
in two words:
Bolson Engineering
Built for legacy with passionate expert engineering services